蜜锚共年睬壁恰诲滤棠翻帅柬
第一章引言
1.1软件的概念随堂测验
1、单选题:
Software doesn’t include _____.
A: data
B: CPU
C: manual
D: contract
答案: CPU
2、单选题:
Which of the following statement about software is NOT true?
A: Software is abstract.
B: Software is portable.
C: Software wears out.
D: Software is logical entity.
答案: Software wears out.
3、单选题:
Which of the following statements about software characteristics is true?
A: Software can have multiple copies. Software can have multiple copies. – 正确
B: Software is a kind of concrete physical entity.
C: The faults in a software system come from wearing out.
D: Software is something mysterious mastered by some geniuses.
答案: Software can have multiple copies. Software can have multiple copies. – 正确
1.3软件工程职业道德和从业规范随堂测试
1、单选题:
Which of the following is not a software engineering code of ethics?
A: Software engineers shall be fair to and supportive of their colleagues.
B: Software engineers shall participate in lifelong learning regarding the practice of their profession and shall promote an ethical approach to the practice of the profession.
C: Software engineers shall advance the integrity and reputation of the profession consistent with the public interest.
D: Software engineers shall maintain dependence in their professional judgment.
答案: Software engineers shall maintain dependence in their professional judgment.
第一章单元测试
1、单选题:
Which of the following is true about the possible effect of adding new programmers to a software project?__关于增加新程序员到软件项目的可能效果,下列哪个是正确的?__
A: Production will generally be sped up because new programmers generally bring bright new implementation ideas to a project.
B: Production will generally be slowed down because of the need for training and additional coordination.
C: Production will generally be sped up because programmers are generally most productive when they first start on a project.
D: Production will generally be sped up because of the decrease in pressure on the programmers already working on the project.
答案: Production will generally be slowed down because of the need for training and additional coordination.
2、单选题:
Which of the following statements about computer science and software engineering is correct? ______关于计算机科学和软件工程的以下语句哪个是正确的? ______
A: Computer scientists and software engineers care about the same thing.
B: Software engineers always try to find all kinds of solutions for the target software system.
C: Computer scientists’ job is to find the most suitable solution for software system.
D: The relationship between Computer Science and Software Engineering is just like the one between Chemistry and Chemical Engineering.
答案: The relationship between Computer Science and Software Engineering is just like the one between Chemistry and Chemical Engineering.
3、单选题:
Which of the following statements is not correct? _______ 以下哪个语句是不正确的? _______
A: Client is the individual or organization that wants a product to be developed.
B: Developers are the members of the organization responsible for building that product.
C: User is the person or persons on whose behalf the client has commissioned the product and who will utilize the software.
D: The client, developer and user cannot be the same person or the same organization.
答案: The client, developer and user cannot be the same person or the same organization.
4、单选题:
Which of the following statements about software is true? __________以下哪个语是正确的? _______
A: Software is transplantable.
B: Software is a kind of concrete physical entity.
C: The faults in a software system come from wearing out.
D: Software is something mysterious mastered by some geniuses.
答案: Software is transplantable.
5、单选题:
Which of the following statements about ethical issues is not correct? ___________关于伦理问题的以下哪些语句是不正确的? ___________
A: Most societies for professionals have a code of ethics to which all its members must adhere.
B: If the software engineers act in the best interests of their client and employer, he won’t be able to act consistently with the public interest.
C: Software products are developed and maintained by humans. If those individuals are hard working, intelligent, sensible, up to data and above all, ethical, then the chances are good that the way that the software products they develop and maintain will be satisfactory.
D: The two major societies for computer professionals, the Association for Computing Machinery (ACM) and the Computer Society of the Institute of Electrical and Electronics Engineers (IEEE-CS) jointly approve a Software Engineering Code of Ethics and Professional Practice as the standard for teaching and practicing software engineering.
答案: If the software engineers act in the best interests of their client and employer, he won’t be able to act consistently with the public interest.
6、单选题:
Which of the following is not software ? ___________以下哪项不是软件? ___________
A: testing plan
B: users
C: contract
D: requirements documents
答案: users
7、单选题:
Which of the following is true?____________以下哪项是正确的? ___________
A: A class can be taken as a module.
B: Business requirements is the easiest task during software life cycle, because no design and coding occur during the phase.
C: Hardware wears out. So does software. That is why software needs maintenance.
D: The task of requirements workflow is to collect and determine what client really wants.
答案: A class can be taken as a module.
8、单选题:
___________ is a discipline whose aim is the production of fault-free software, delivered on time and within budget, that satisfies the client’s needs. ___________是一个学科,其目标是生产无故障的软件,按时,在预算内交付,满足客户的需求。
A: Software engineering
B: Software process
C: Software
D: Software testing
答案: Software engineering
9、单选题:
Which of the following statements about software characteristics is true? _________关于软件特性的描述哪项是对的? _________
A: The faults in a software system come from wearing out.
B: Software is something mysterious controlled by some geniuses.
C: Software is transplantable.
D: Software is a kind of concrete physical entity.
答案: Software is transplantable.
10、单选题:
Which of the following is not a software engineering code of ethics?______以下哪项不是软件工程的道德规范?_____
A: Software engineers shall advance the integrity and reputation of the profession consistent with the public interest.
B: Software engineers shall participate in lifelong learning regarding the practice of their profession and shall promote an ethical approach to the practice of the profession.
C: Software engineers shall maintain dependence in their professional judgment.
D: Software engineers shall be fair to and supportive of their colleagues.
答案: Software engineers shall maintain dependence in their professional judgment.
11、单选题:
Software engineers shall act consistently with the _______ interest.软件工程师应按照和_______的利益一致行事。
A: public
B: friends
C: government
D: family
答案: public
12、单选题:
Which of the following is not software? __________以下哪项不是软件? __________
A: Computer game
B: Power Point
C: USB
D: Software Project Management Plan
答案: USB
第二章软件过程
2.1软件过程随堂测试
1、单选题:
The series of phases that software undergoes, from concept exploration to final retirement, is termed its _______.
A: process or life cycle process or life cycle – 正确
B: paradigm
C: logic
D: business
答案: process or life cycle process or life cycle – 正确
2、单选题:
Which of the following should be treated as a separate workflow of software process?
A: Testing
B: Project Planning
C: Requirements
D: Documenting
答案: Requirements
2.2软件测试随堂测试
1、单选题:
Software testing is _______.
A: constructive
B: destructive
C: to prove there is no faults in the software system
D: to cover faults in the software system
答案: destructive
2、单选题:
______ is to check regression faults.
A: Debugging
B: Maintenance
C: Regression testing
D: Acceptance testing
答案: Regression testing
第二章单元测试
1、单选题:
Which of the following statements about software life cycle is true? ___________关于软件生命周期的描述以下哪项是对的? ___________
A: Software life cycle is the repetitive nature of software testing.
B: Every software system has its life cycle.
C: Software life cycle is the period of time that a software product is in service.
D: Software life cycle is the cycling through phases of specification, design, implementation, and testing.
答案: Every software system has its life cycle.
2、单选题:
The series of phases that software undergoes, from concept exploration to final retirement, is termed its ______.软件经历的系列阶段,从概念探索到最终退役,被称为其______。
A: life cycle or process
B: paradigm
C: logic
D: business
答案: life cycle or process
3、单选题:
Which of the following statements is true? _________下列哪项是正确的? _________
A: If a new coding technique will reduce coding time, developing team should surely adopt it to develop projects, which will save time and cost versus the old coding technique.
B: A good coding technique cannot surely speed up the whole software development.
C: Adding more people to a project that is already behind schedule is a good way to catch up.
D: Good software systems do not need maintenance.
答案: A good coding technique cannot surely speed up the whole software development.
4、单选题:
Which of the following should be treated as a separate phase of software life cycle? ______下列哪一个应该被视为软件生命周期的单独阶段? ______
A: Testing
B: Project Planning
C: Implementation and integration
D: Documenting
答案: Implementation and integration
5、单选题:
Which of the following statements is not true? __________以下哪个语句是不正确的? __________
A: It is quite common that requirements always change, which makes big trouble for development organization.
B: Users always welcome the completed software system.
C: Sometimes, the clients do not know what they really need.
D: Some good software organizations can forecast the requirements of the potential users, so they can lead clients and users.
答案: Users always welcome the completed software system.
6、单选题:
Which of the following statements is not correct? ________以下哪个语句是不正确的? __________
A: If all the developers are professional enough, management won’t be needed.
B: The software development is not the mysterious technique of a certain individual labor, but should be the engineering of an organization of all kinds of people.
C: A software development team should include kinds of people.
D: Software project development is a team work.
答案: If all the developers are professional enough, management won’t be needed.
7、单选题:
In which of the following phases of software development is it the cheapest to fix a fault? _______在软件开发的以下哪个阶段解决故障最廉价? _______
A: The integration phase
B: The design phase
C: The implementation phase
D: The maintenance phase
答案: The design phase
8、单选题:
Whic
上方为免费预览版答案,如需购买完整答案,请点击下方红字:
为了方便下次阅读,建议在浏览器添加书签收藏本网页
添加书签方法:
1.电脑按键盘的Ctrl键+D键即可收藏本网页
2.手机浏览器可以添加书签收藏本网页
点击浏览器底部菜单-【添加书签】-收藏本网页
点击浏览器底部菜单-【书签/历史】-可查看本网页
获取更多慕课答案,欢迎在浏览器访问我们的网站:
http://mooc.mengmianren.com
注:请切换至英文输入法输入域名,如果没有成功进入网站,请输入完整域名:http://mooc.mengmianren.com/
我们的公众号
打开手机微信,扫一扫下方二维码,关注微信公众号:萌面人APP
本公众号可查看各种网课答案,还可免费查看大学教材答案
点击这里,可查看公众号功能介绍
APP下载
APP功能说明
1.可查看各种网课答案
点击【萌面人官网】,可查看知到智慧树,超星尔雅学习通,学堂在线等网课答案
点击【中国大学慕课答案】,可查看mooc慕课答案
2.可一键领取淘宝/天猫/京东/拼多多无门槛优惠券
如图所示,点击对应图标即可领取淘宝/天猫/京东/拼多多无门槛优惠券
霓雷衔缺竞杰掏佰槽井搬诞萝